Case Study: Innovative Retrofitting at a Wastewater Treatment Facility
Case Study: Innovative Retrofitting at a Wastewater Treatment Facility
Client Background
The Challenge
Millstream’s Approach
The Result
Minimized Downtime
The innovative approach significantly reduced retrofitting time, minimizing downtime for the wastewater treatment facility.
Enhanced Reliability
Thordon Regular material and precision engineering ensured that the new sprocket exceeded the performance of the original, contributing to enhanced system reliability.
Adaptability for Future Retrofits
The methodology developed by Millstream showcased adaptability for future retrofitting projects where original drawings might be unavailable.